Innofreight Solutions premiere with US Steel Košice

Innovative solution for transport and unloading of lump iron ore makes rail logistics more efficient

Innofreight Solutions premiere with US Steel Košice

On the 16th of January 2019, Innofreight unloaded the first train with 15 InnoWaggons equipped with 90 MonTainer XM. The 20 t heavy containers were loaded with lump iron ore (grain size 0-30 mm) in the port of Świnoujście (POL) and unloaded at US Steel Košice (SVK) with a Kalmar DCF 370 forklift into the freestanding hopper with height of 3.850 mm.

According to Innofreight Solutions the unloading takes 3 minutes per container. The loaded iron ore falls out and the small frozen residues in the corners and walls can easily be shaken off. The result is a completely empty container.

www.innofreight.com

 

Advertisement